Customization: | Available |
---|---|
Material: | Aluminum |
Flag & Banner Material: | Polyester |
Still deciding? Get samples of US$ 35/Set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Supplied:
×1 FlagTrax top curve track with 2 Arm Adapters and nuts and bolts to tighten once the arm is in place
×1 FlagTrax bottom track with tapped holes for flag tensioner(s)
×1,×2 or no middle tracks depending on models
×1 Plastic PushPull Rod
×1 FlagTrax Top Supporter Bracket with 1 Allen Wrench
×1 Right Flag Tensioner with cap screw and spring washer pre-installed
×2 FlagTrax Key
×1 Locking Cap for PushPull Rod
×2 A 64 D rivets per track for tracks assembly
The surface where the bracket will be inatalled is what will determine the type of screws that should be used.Please make sure to get a professional's recommendation before installation.We recommend that you pre-drill holes on the track before installation.For the straight track(s),there should be 3 holes:one 8'' from the bottom,one 8'' from the top and one in the middle of the track (36'' from top or bottom).For the top curved track,there should be two holes:one 8'' and one 26.5'' from the bottom of the track.
Assemble the bracket before putting it up by riveting all the tracks with the provided rivets.
Track spacers must be used at every drilled hole to avoid damaging the track.Once the top support bracket is installed,slide the assembled track into it using the adapters.When fitted,tighten them.Fasten the bracket Track from top to bottom to the support with appropriate screws.